Mēs informējam Jūs, ka šī tīmekļa vietne izmanto savus,
tehniski nepieciešamus un trešo pušu sīkdatnes failus, lai
nodrošinātu tīmekļa vietnes lietotāju draudzīgumu un
garantētu augstu funkcionalitāti. Turpinot šīs vietnes
pārlūkošanu, Jūs piekrītat sīkdatņu failu izmantošanai.
Uzziniet vairāk par sīkdatņu failu izmantošanu,
apskatot
konfidencialitātes politiku
Es piekrītu
SS-Būve, SIA
Building log building, Guļbūves, Строитель срубных зданийHow poorly built SS-Buve.
Ordered the construction of a house in Bani, through 4 months start to rot and be borne fungus terrace around the new House, then moved to the lower fungus baulk. I spent the. examination which showed that the fungus is gone because, logs were strengthened on the damp ground just hammered wooden pegs or geo-textile or ventilation slits were made, the examiner gave an unequivocal conclusion-so build it got damp and Pegs. started to rot, a fungus went on all soprikasaûŝeesâ with them, everything had to be redone. Director of SS-BUVE denies the obvious violations by his organization during construction and does not want to eliminate any violations, nor compensate for my expenses. SS-officers violated terms of technological BUVE zastyvaniû materials when laying tiles, because the Director had urged them to move to the next object of construction, so they unacceptably reduce the Assembly technology to the detriment of the final result. Carefully.
09.09.2014.